Enhancement of the sludge dewatering section of a wastewater treatment plant with a potentialof 48,000 P.E.
The project involved the installation of a new Jumbo centrifuge, a polyelectrolyte preparer, metering pumps, sludge feed pumps and other tools.
A new electrical control panel was also installed and a special pressurised and air-conditioned hood was created.